summaryrefslogtreecommitdiff
path: root/man/PEC_sw_drainage_UK.Rd
diff options
context:
space:
mode:
Diffstat (limited to 'man/PEC_sw_drainage_UK.Rd')
-rw-r--r--man/PEC_sw_drainage_UK.Rd5
1 files changed, 4 insertions, 1 deletions
diff --git a/man/PEC_sw_drainage_UK.Rd b/man/PEC_sw_drainage_UK.Rd
index f3d6169..6125c3c 100644
--- a/man/PEC_sw_drainage_UK.Rd
+++ b/man/PEC_sw_drainage_UK.Rd
@@ -35,10 +35,13 @@ The predicted concentration in surface water in µg/L
}
\description{
This implements the method specified in the UK data requirements handbook and was checked against the spreadsheet
-published on the CRC website
+published on the CRC website. Degradation before the start of the drainage period is taken into account if
+\code{latest_application} is specified and the degradation parameters are given either as a \code{soil_DT50} or a \code{model}.
}
\examples{
PEC_sw_drainage_UK(150, Koc = 100)
+PEC_sw_drainage_UK(60, interception = 0.5, Koc = 550,
+ latest_application = "01 July", soil_DT50 = 200)
}
\references{
HSE's Chemicals Regulation Division (CRD) Active substance

Contact - Imprint