aboutsummaryrefslogtreecommitdiff
path: root/R/PEC_sw_exposit_runoff.R
blob: 8b89cd92af1116b0a6adc3338050d257e5f129f5 (plain) (blame)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
#' Runoff loss percentages as used in Exposit 3
#'
#' A table of the loss percentages used in Exposit 3 for the twelve different Koc classes
#'
#' @name perc_runoff_exposit
#' @format A data frame with percentage values for the dissolved fraction and the fraction
#'   bound to eroding particles, with Koc classes used as row names
#'   \describe{
#'     \item{Koc_lower_bound}{The lower bound of the Koc class}
#'     \item{dissolved}{The percentage of the applied substance transferred to an
#'       adjacent water body in the dissolved phase}
#'     \item{bound}{The percentage of the applied substance transferred to an
#'       adjacent water body bound to eroding particles}
#'   }
#' @source Excel 3.02 spreadsheet available from
#'   \url{https://www.bvl.bund.de/SharedDocs/Downloads/04_Pflanzenschutzmittel/zul_umwelt_exposit.html}
#' @docType data
#' @examples
#' print(perc_runoff_exposit)
"perc_runoff_exposit"

#' Runoff reduction percentages as used in Exposit
#'
#' A table of the runoff reduction percentages used in Exposit 3 for different vegetated buffer widths
#'
#' @name perc_runoff_reduction_exposit
#' @format A named list of data frames with reduction percentage values for the
#' dissolved fraction and the fraction bound to eroding particles, with
#' vegetated buffer widths as row names. The names of the list items are the Exposit versions
#' from which the values were taken.
#'   \describe{
#'     \item{dissolved}{The reduction percentage for the dissolved phase}
#'     \item{bound}{The reduction percentage for the particulate phase}
#'   }
#' @source Excel 3.02 spreadsheet available from
#'   \url{https://www.bvl.bund.de/SharedDocs/Downloads/04_Pflanzenschutzmittel/zul_umwelt_exposit.html}
#'
#'   Agroscope version 3.01a with additional runoff factors for 3 m and 6 m buffer zones received from Muris Korkaric (not published).
#'   The variant 3.01a2 was introduced for consistency with previous calculations performed by Agroscope for a 3 m buffer zone.
#' @docType data
#' @examples
#' print(perc_runoff_reduction_exposit)
"perc_runoff_reduction_exposit"

#' Calculate PEC surface water due to runoff and erosion as in Exposit 3
#'
#' This is a reimplementation of the calculation described in the Exposit 3.02 spreadsheet file,
#' in the worksheet "Konzept Runoff".
#'
#' @param rate The application rate in g/ha
#' @param interception The fraction intercepted by the crop
#' @param Koc The sorption coefficient to soil organic carbon
#' @param DT50 The soil half-life in days
#' @param t_runoff The time between application and the runoff event, where degradation occurs, in days
#' @param exposit_reduction_version The version of the reduction factors to be used. "3.02" is the current
#'   version used in Germany, "3.01a" is the version with additional percentages for 3 m and 6 m buffer
#'   zones used in Switzerland. "3.01a2" is a version introduced for consistency with previous calculations
#'   performed for a 3 m buffer zone in Switzerland, with the same reduction being applied to the dissolved
#'   and the bound fraction.
#' @param V_ditch The volume of the ditch is assumed to be 1 m * 100 m * 30 cm = 30 m3
#' @param V_event The unreduced runoff volume, equivalent to 10 mm precipitation on 1 ha
#' @param dilution The dilution factor
#' @return A list containing the following components
#'   \describe{
#'     \item{perc_runoff}{The runoff percentages for dissolved and bound substance}
#'     \item{runoff}{A matrix containing dissolved and bound input for the different distances}
#'     \item{PEC_sw_runoff}{A matrix containing PEC values for dissolved and bound substance
#'       for the different distances. If the rate was given in g/ha, the PECsw are in microg/L.}
#'   }
#' @export
#' @source Excel 3.02 spreadsheet available from
#'   \url{https://www.bvl.bund.de/SharedDocs/Downloads/04_Pflanzenschutzmittel/zul_umwelt_exposit.html}
#' @seealso \code{\link{perc_runoff_exposit}} for runoff loss percentages and \code{\link{perc_runoff_reduction_exposit}} for runoff reduction percentages used
#' @examples
#'   PEC_sw_exposit_runoff(500, Koc = 150)
#'   PEC_sw_exposit_runoff(600, Koc = 10000, DT50 = 195, exposit = "3.01a")
PEC_sw_exposit_runoff <- function(rate, interception = 0, Koc, DT50 = Inf, t_runoff = 3,
  exposit_reduction_version = c("3.02", "3.01a", "3.01a2", "2.0"),
  V_ditch = 30, V_event = 100, dilution = 2)
{
  k_deg <- log(2)/DT50
  input <- rate * (1 - interception) * 1 * exp(-k_deg * t_runoff) # assumes 1 ha treated area

  if (length(Koc) > 1) stop("Only one compound at a time supported")

  exposit_reduction_version <- match.arg(exposit_reduction_version)
  red_water <- pfm::perc_runoff_reduction_exposit[[exposit_reduction_version]]["dissolved"] / 100
  red_bound <- pfm::perc_runoff_reduction_exposit[[exposit_reduction_version]]["bound"] / 100
  reduction_runoff <- pfm::perc_runoff_reduction_exposit[[exposit_reduction_version]] / 100
  transfer_runoff <- 1 - reduction_runoff

  V_runoff <- V_event * (1 - reduction_runoff[["dissolved"]]) # m3
  V_flowing_ditch_runoff <- dilution * (V_ditch + V_runoff)

  f_runoff_exposit <- function(Koc) {
    Koc_breaks <- c(pfm::perc_runoff_exposit$Koc_lower_bound, Inf)
    Koc_classes <- as.character(cut(Koc, Koc_breaks, labels = rownames(pfm::perc_runoff_exposit)))
    perc_runoff <- pfm::perc_runoff_exposit[Koc_classes, c("dissolved", "bound")]
    if (identical(Koc, 0)) perc_runoff <- c(dissolved = 0, bound = 0)
    return(unlist(perc_runoff) / 100)
  }
  f_runoff <- f_runoff_exposit(Koc)
  runoff_dissolved <- input * f_runoff["dissolved"] * transfer_runoff["dissolved"]
  runoff_bound <- input * f_runoff["bound"] * transfer_runoff["bound"]
  runoff_input <- cbind(runoff_dissolved, runoff_bound)
  runoff_input$total <- runoff_input$dissolved + runoff_input$bound

  PEC_sw_runoff <- 1000 * runoff_input / V_flowing_ditch_runoff

  result <- list(
    perc_runoff = 100 * f_runoff,
    runoff = runoff_input,
    PEC_sw_runoff = PEC_sw_runoff)
  return(result)
}

#' Calculate PEC surface water due to drainage as in Exposit 3
#'
#' This is a reimplementation of the calculation described in the Exposit 3.02 spreadsheet file,
#' in the worksheet "Konzept Drainage". Although there are four groups of
#' compounds ("Gefährdungsgruppen"), only one distinction is made in the
#' calculations, between compounds with low mobility (group 1) and compounds
#' with modest to high mobility (groups 2, 3 and 4). In this implementation,
#' the group is derived only from the Koc, if not given explicitly. For
#' details, see the discussion of the function arguments below.
#'
#' @param rate The application rate in g/ha
#' @param interception The fraction intercepted by the crop
#' @param Koc The sorption coefficient to soil organic carbon used to determine the mobility. A trigger
#'   value of 550 L/kg is used in order to decide if Koc >> 500.
#' @param mobility Overrides what is determined from the Koc.
#' @param DT50 The soil half-life in days
#' @param t_drainage The time between application and the drainage event, where degradation occurs, in days
#' @param V_ditch The volume of the ditch is assumed to be 1 m * 100 m * 30 cm = 30 m3
#' @param V_drainage The drainage volume, equivalent to 1 mm precipitation on 1 ha for spring/summer or 10 mm for
#'   autumn/winter/early spring.
#' @param dilution The dilution factor
#' @return A list containing the following components
#'   \describe{
#'     \item{perc_runoff}{The runoff percentages for dissolved and bound substance}
#'     \item{runoff}{A matrix containing dissolved and bound input for the different distances}
#'     \item{PEC_sw_runoff}{A matrix containing PEC values for dissolved and bound substance
#'       for the different distances. If the rate was given in g/ha, the PECsw are in microg/L.}
#'   }
#' @export
#' @source Excel 3.02 spreadsheet available from
#'   \url{https://www.bvl.bund.de/SharedDocs/Downloads/04_Pflanzenschutzmittel/zul_umwelt_exposit.html}
#' @seealso \code{\link{perc_runoff_exposit}} for runoff loss percentages and \code{\link{perc_runoff_reduction_exposit}} for runoff reduction percentages used
#' @examples
#'   PEC_sw_exposit_drainage(500, Koc = 150)
PEC_sw_exposit_drainage <- function(rate, interception = 0, Koc = NA, mobility = c(NA, "low", "high"), DT50 = Inf, t_drainage = 3,
  V_ditch = 30, V_drainage = c(spring = 10, autumn = 100), dilution = 2)
{
  # Rückstand zum Zeitpunkt des Niederschlagsereignisses (residue at the time of the drainage event)
  k_deg <- log(2)/DT50
  residue <- rate * (1 - interception) * 1 * exp(-k_deg * t_drainage) # assumes 1 ha treated area

  mobility <- match.arg(mobility)
  if (is.na(mobility)) {
    if (is.na(Koc)) stop("Koc is needed if the mobility is not specified")
    else {
      if (Koc > 550) mobility = "low"
      else mobility = "high"
    }
  }

  V_ditch_drainage <- V_ditch + V_drainage
  V_flowing_ditch_drainage <- dilution * V_ditch_drainage

  # Gesamtaustrag (total fraction of the residue drained)
  if (mobility == "low") {
    f_drainage_total <- c(spring = 0.01 * 1e-2,
                          autumn = 0.05 * 1e-2)
  } else {
    f_drainage_total <- c(spring = 0.2 * 1e-2,
                          autumn = 1.0 * 1e-2)
  }

  f_peak = c(spring = 0.125, autumn = 0.25) # Stoßbelastung (fraction drained at event)

  PEC_sw_drainage <- 1000 * residue * f_drainage_total * f_peak / V_flowing_ditch_drainage

  result <- list(
    perc_drainage_total = 100 * f_drainage_total,
    perc_peak = 100 * f_peak,
    PEC_sw_drainage = PEC_sw_drainage)
  return(result)
}